2026-02-20 / Adjournment Motion: Coal procurement for Lakvijaya Power Plant at Norochcholai (Part 2)
Hon. (Dr.) Harsha de Silva
2026-02-20
Hon. (Dr.) Harsha de Silva drew attention to a specific procurement requirement detailed in the document under consideration, citing page 22, section 5.5 on "Minimum qualifications for supplier registration." He specifically referenced clause 5.5.1(a), which stipulates that prospective suppliers must have supplied at least one million metric tons of coal with a Gross Calorific Value (GCV) of 5,900 kcal/kg or higher within the past 36 months.
It is. Please see page 22, section 5.5 “Minimum qualifications for supplier registration,” and 5.5.1(a): “In the past 36 months, supply of at least 1 million metric tons with GCV 5,900 kcal/kg or higher.”